Project Summary

Client Name: Fillmore Central Public Schools
Date Completed: July 2018
Location: Geneva, NE
General Contractor: Cheever Construction
Architect: CG ID Innovative Design in Architecture
Size: 10,965 square feet 

Project Scope

Sub-contract structural steel and pre-engineered metal building.

PRINTABLE PROJECT PDF

FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central.

Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which consisted of a Chief Pre-Engineered® metal building with a standing seam metal roof and insulated metal wall panels.