It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central.
Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which consisted of a Chief Pre-Engineered® metal building with a standing seam metal roof and insulated metal wall panels.