Papillion Field House is a 53,000 ft2 indoor soccer facility in Papillion, Nebraska where we provided a Chief Buildings® pre-engineered metal building (PEMB). With this, we provided the entire steel erection of the Field House, making it a full Clearspan building with no obstructions. The building’s dimmensions are 200 ft wide by 265 ft long. Included in our scope of the project was high R-value insulation in the walls as well as the roof, ontop of a 35′ low eave and 50′ high eave. Also included is a structural mezzanine for viewing of the second floor. We were a subcontractor to Sampson Construction, who was the General Contractor on this project. The Papillion Field House is our 3rd indoor sports facility that we’ve worked with Sampson Construction on.
Project Manager: Jo Wendt