by ironhideadmin | Oct 16, 2020
This Parpart project consisted of replacing standard grade panels with 24 gauge 7.2 panel and 24 gauge Masterline 16 on a 6,000 square foot building. Ironhide enjoyed working with the owners and building a relationship throughout this project.
by genr8admin | Jun 11, 2020
Ironhide is excited to have been selected as the general contractor on the new Ditch Witch Undercon project in Gretna, NE. This will be a new 17,000 square foot, metal building that will consist of a full-scale shop, wash bay, offices, and sales areas. We are thankful...
by genr8admin | Jun 11, 2020
Papillion Field House is a 53,000 ft2 indoor soccer facility in Papillion, Nebraska where we provided a Chief Buildings® pre-engineered metal building (PEMB). With this, we provided the entire steel erection of the Field House, making it a full Clearspan building with...
by genr8admin | Jun 11, 2020
Millard Airport Hangar was a structural restoration project that we were the general contractor on. This building was 120′ x 120′ in which we installed roof hugger retrofit solutions. During this project we used the roof hugger retrofit approach to install insulation...
by genr8admin | Jun 11, 2020
Ironhide Construction was pleased to be the general contractor on this 5,125 sq ft structural steel building. This building we did the structure and erection from ground up. To hear more about what the Project Manager Jo has to say about this project, follow the...