by ironhideadmin | Oct 27, 2020
Ironhide Construction is proud to have been chosen as the General Contractor on the Bessery Nursery addition located in Halsey, NE. This project consists of 36,000sqft of Greenhouse, 6,000 sqft Headhouse, 6,000 sqft Freezer building, and a Pump house. The Pump house...
by ironhideadmin | Oct 6, 2020
Ironhide Construction has been chosen as the General Contractor for the Camp Ashland ACFT Field House. This will be a new 18,000 sqft Pre Engineered Metal Building.
by genr8admin | Jun 11, 2020
Ironhide is excited to have been selected as the general contractor on the new Ditch Witch Undercon project in Gretna, NE. This will be a new 17,000 square foot, metal building that will consist of a full-scale shop, wash bay, offices, and sales areas. We are thankful...
by genr8admin | Jun 11, 2020
On this project we teamed up with Davis Design of Lincoln and Bryan College of Health Sciences to accomplish the complete remodeling of a fifth floor office space into a nursing simulation center. The SIM Center includes Operating, Intensive Care, Medical Surgery,...
by genr8admin | Jun 11, 2020
Ironhide Construction was the general contractor on the City of Lincoln Pole Building which included a 30′ W x 36′ x 16′ high addition to an existing post frame building. This job included cutting concrete and removing it for each of the poles. This building was on an...
Recent Comments