PCE GEIST EXPANSION

PCE GEIST EXPANSION

Ironhide Construction was part of the construction project to expand the Geist corporate headquarters, which is the largest division of PCE, Inc. Ironhide Construction provided and installed a CHIEF Buildings® pre-engineered metal building (PEMB) for the 65,460 ft2...
ALLMAND BROTHERS

ALLMAND BROTHERS

Allmand Brothers is located in Holdrege, NE in which we have been pleased to work as a subcontractor for WDS construction. This project has included five warehouse and manufacturing buildings that consist of 104,00 square feet. The buildings consist of covered loading...
JENSEN TIRE & AUTO HEADQUARTERS

JENSEN TIRE & AUTO HEADQUARTERS

We worked with JE Dunn in Omaha on the Jensen Tire Headquarters project. This is a 14,400 square foot Chief Pre-Engineered Metal Building that came out beautifully.
BNSF FABRICATION SHOP EAST WALL

BNSF FABRICATION SHOP EAST WALL

Ironhide Construction assisted BNSF Railway with structural restoration of its fabrication shop. We removed the existing exterior wall panels, demolished the 80’x15′ sliding crane door, as well as all of the structural steel and footings. Once demo was completed we...
ZOETIS – SYNOVEX EXPANSION

ZOETIS – SYNOVEX EXPANSION

Ironhide Construction was a subcontractor on the project to expand the Zoetis manufacturing site. Ironhide installed insulated metal wall panels and a roof on a 60′ tall structural steel building intended for pharmaceutical grade air infiltration requirements. We...