USDA Greenhouse

USDA Greenhouse

Ironhide Construction is proud to have been chosen as the General Contractor on the Bessery Nursery addition located in Halsey, NE. This project consists of 36,000sqft of Greenhouse, 6,000 sqft Headhouse, 6,000 sqft Freezer building, and a Pump house. The Pump house...
Parpart

Parpart

This Parpart project consisted of replacing standard grade panels with 24 gauge 7.2 panel and 24 gauge Masterline 16 on a 6,000 square foot building. Ironhide enjoyed working with the owners and building a relationship throughout this project.
FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central. Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which...
SID AND HAZEL DILLON TENNIS CENTER

SID AND HAZEL DILLON TENNIS CENTER

Ironhide Construction completed the erection of a pre-engineered metal building — the University of Nebraska-Lincoln’s new tennis complex — the Sid and Hazel Dillon Tennis Center. The Dillon Tennis Center, part of a larger $20.4 million soccer and tennis project, is...
NANG-CATS SIM BUILDING FIRE TRUCK BAY

NANG-CATS SIM BUILDING FIRE TRUCK BAY

This project consists of a 2,355 SF, ground-up, Pre-engineered Metal Building. The Sim Building Fire Truck Bay Addition started at the beginning of November 2019, we are excited, to be the general contractor throughout this project. Thank you to all of our...