PAPILLION FIELD HOUSE PEMB

PAPILLION FIELD HOUSE PEMB

Papillion Field House is a 53,000 ft2 indoor soccer facility in Papillion, Nebraska where we provided a Chief Buildings® pre-engineered metal building (PEMB). With this, we provided the entire steel erection of the Field House, making it a full Clearspan building with...
FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central. Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which...
NUSPINE CHIROPRACTIC DESIGN BUILD

NUSPINE CHIROPRACTIC DESIGN BUILD

Ironhide Construction had the opportunity to team up with a franchise of NuSpine Chiropractic based out of Lincoln, NE. The project consisted of a complete design build of an existing space inside of a commercial property on O Street in Lincoln. Our experience working...
WOODS PARK TENNIS CENTER

WOODS PARK TENNIS CENTER

Woods Park Tennis Center was a 49,000 ft2 pre-engineered metal building project. Ironhide was brought on as a consultant for this project during the design phase. When we were invited on we were given a hand in the design and functionality of the building. The tennis...
HAZARDOUS MATERIALS COLLECTION CENTER

HAZARDOUS MATERIALS COLLECTION CENTER

Ironhide Construction is the general contractor for the City of Lincoln’s permanent househould hazardous materials collection center in Lincoln, Nebraska. The 7,500 SF facility was built from the ground up and includes office space, bathrooms with showers, storage, a...