by genr8admin | Jun 11, 2020
Millard Airport Hangar was a structural restoration project that we were the general contractor on. This building was 120′ x 120′ in which we installed roof hugger retrofit solutions. During this project we used the roof hugger retrofit approach to install insulation...
by genr8admin | Jun 11, 2020
Woods Park Tennis Center was a 49,000 ft2 pre-engineered metal building project. Ironhide was brought on as a consultant for this project during the design phase. When we were invited on we were given a hand in the design and functionality of the building. The tennis...
by genr8admin | Jun 11, 2020
Ironhide Construction is the general contractor for the City of Lincoln’s permanent househould hazardous materials collection center in Lincoln, Nebraska. The 7,500 SF facility was built from the ground up and includes office space, bathrooms with showers, storage, a...
by genr8admin | Jun 11, 2020
Ironhide Construction completed the erection of a pre-engineered metal building — the University of Nebraska-Lincoln’s new tennis complex — the Sid and Hazel Dillon Tennis Center. The Dillon Tennis Center, part of a larger $20.4 million soccer and tennis project, is...
by genr8admin | Jun 10, 2020
We worked with JE Dunn in Omaha on the Jensen Tire Headquarters project. This is a 14,400 square foot Chief Pre-Engineered Metal Building that came out beautifully.
Recent Comments