by genr8admin | Jun 10, 2020
Abante Marketing is a project that consisted of a 6,500 SF Pre-Engineered Metal building with Insulated Metal Panels as the facade. Ironhide was the General Contractor for this project. This was a complete design build starting with a napkin sketch with the owners...
by genr8admin | Jun 10, 2020
Woof! Dog Care Center is a project that consisted of a 15,750 SF Pre-Engineered Metal Building. The General Contractor was Hampton Construction. Ironhide erected the building, installed the roof and wall panels, and installed Simple Saver Insulation throughout. The...
by genr8admin | Jun 10, 2020
Ironhide Construction was a subcontractor on the project to expand the Zoetis manufacturing site. Ironhide installed insulated metal wall panels and a roof on a 60′ tall structural steel building intended for pharmaceutical grade air infiltration requirements. We...
by genr8admin | Jun 10, 2020
Ironhide Construction supplied and erected a Chief pre-engineered metal building for the Companion Linc project in Lincoln, Nebraska. Ironhide installed insulated metal panels on the front side of the building, while the sides and back were paneled with a traditional...
by genr8admin | Jun 10, 2020
Ironhide Construction erected a 34,520 SF pre-engineered metal building with stucco embossed insulated wall panels and architectural standing seam roof with a large cupola and two-offshoot buildings.
Recent Comments