by genr8admin | Jun 11, 2020
Papillion Field House is a 53,000 ft2 indoor soccer facility in Papillion, Nebraska where we provided a Chief Buildings® pre-engineered metal building (PEMB). With this, we provided the entire steel erection of the Field House, making it a full Clearspan building with...
by genr8admin | Jun 11, 2020
It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central. Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which...
by genr8admin | Jun 11, 2020
Woods Park Tennis Center was a 49,000 ft2 pre-engineered metal building project. Ironhide was brought on as a consultant for this project during the design phase. When we were invited on we were given a hand in the design and functionality of the building. The tennis...
by genr8admin | Jun 11, 2020
Ironhide Construction is the general contractor for the City of Lincoln’s permanent househould hazardous materials collection center in Lincoln, Nebraska. The 7,500 SF facility was built from the ground up and includes office space, bathrooms with showers, storage, a...
by genr8admin | Jun 10, 2020
We worked with JE Dunn in Omaha on the Jensen Tire Headquarters project. This is a 14,400 square foot Chief Pre-Engineered Metal Building that came out beautifully.
Recent Comments