PAPILLION FIELD HOUSE PEMB

PAPILLION FIELD HOUSE PEMB

Papillion Field House is a 53,000 ft2 indoor soccer facility in Papillion, Nebraska where we provided a Chief Buildings® pre-engineered metal building (PEMB). With this, we provided the entire steel erection of the Field House, making it a full Clearspan building with...
AMIGOS

AMIGOS

Ironhide Construction was pleased to be the general contractor on this 5,125 sq ft structural steel building. This building we did the structure and erection from ground up. To hear more about what the Project Manager Jo has to say about this project, follow the...
FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central. Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which...
WOODS PARK TENNIS CENTER

WOODS PARK TENNIS CENTER

Woods Park Tennis Center was a 49,000 ft2 pre-engineered metal building project. Ironhide was brought on as a consultant for this project during the design phase. When we were invited on we were given a hand in the design and functionality of the building. The tennis...
US BANK PARKING GARAGE RESTORATION

US BANK PARKING GARAGE RESTORATION

The south precast concrete panel wall of the US Bank parking structure was impacted and began falling off the building. Ironhide Construction was called in to inspect the site. By Noon the next day, the street was shut down, engineers visited and designed a shoring...