by genr8admin | Jun 11, 2020
It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central. Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which...
by genr8admin | Jun 11, 2020
Woods Park Tennis Center was a 49,000 ft2 pre-engineered metal building project. Ironhide was brought on as a consultant for this project during the design phase. When we were invited on we were given a hand in the design and functionality of the building. The tennis...
by genr8admin | Jun 11, 2020
The south precast concrete panel wall of the US Bank parking structure was impacted and began falling off the building. Ironhide Construction was called in to inspect the site. By Noon the next day, the street was shut down, engineers visited and designed a shoring...
by genr8admin | Jun 10, 2020
Ironhide Construction erected the structural steel that holds up the frame of the new 20,000 SF, two-story Home Real Estate headquarters in Lincoln, Nebraska.
by genr8admin | Jun 10, 2020
Ironhide Construction Inc acted in the role of general contractor on the removal and replacement of 300′ of railroad track and foundation through an existing facility. In order to impact the railroads production needs the schedule on this project had to be managed...