PAPILLION FIELD HOUSE PEMB

PAPILLION FIELD HOUSE PEMB

Papillion Field House is a 53,000 ft2 indoor soccer facility in Papillion, Nebraska where we provided a Chief Buildings® pre-engineered metal building (PEMB). With this, we provided the entire steel erection of the Field House, making it a full Clearspan building with...
FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

FILLMORE CENTRAL WRESTLING AND WEIGHT ROOM ADDITION

It was a pleasure to work with Cheever Construction once again for the wonderful school district of Fillmore Central. Ironhide Construction Inc’s portion of the project included the structural steel connection between the existing building and the new building which...
WOODS PARK TENNIS CENTER

WOODS PARK TENNIS CENTER

Woods Park Tennis Center was a 49,000 ft2 pre-engineered metal building project. Ironhide was brought on as a consultant for this project during the design phase. When we were invited on we were given a hand in the design and functionality of the building. The tennis...
SID AND HAZEL DILLON TENNIS CENTER

SID AND HAZEL DILLON TENNIS CENTER

Ironhide Construction completed the erection of a pre-engineered metal building — the University of Nebraska-Lincoln’s new tennis complex — the Sid and Hazel Dillon Tennis Center. The Dillon Tennis Center, part of a larger $20.4 million soccer and tennis project, is...
FIRST STATE BANK NEBRASKA

FIRST STATE BANK NEBRASKA

Ironhide Construction designed and installed our Ironhide Architectural Panel System on the two-story First State Bank building. The system includes a machine formed aluminum architectural metal panel that was anodized dark bronze and custom made for this project....