- Client: Bryan Medical Center
- Date Completed: 05/31/2019
- Location: Lincoln, Nebraska
- Architect: Davis Design, Inc.
- Size: 5,500 square feet
- Download PDF
Bryan College of Health Sciences Simulation Center
On this project, we teamed up with Bryan College of Health Sciences to completely remodel an existing fifth-floor office space into a nursing simulation center. The SIM Center includes Operating, Intensive Care, Medical Surgery, Pre-Op, Clinical, PEDS, and Labor/Delivery simulation rooms that mimic what an environment and/or situation would be like in the daily operations of a hospital. Because of the strict requirements of infection and dust control, Ironhide Construction worked closely with the hospital and subcontractors to stay in compliance. We met these requirements with dust barriers, negative air machines, and plenty of continuous cleaning in the space.