- Client: Brester Construction
- Date Completed: 02/09/2023
- Location: Lincoln, NE
- Architect: Clark & Enersen
- Size: 19,500 sq ft
- Download PDF
Lincoln Christian
As a result of steady enrollment growth Lincoln Christian School realized the need for a multi-use facility. Ironhide Construction supplied and erected a 22,100 SF facility that is utilized for basketball, volleyball, and wrestling. Two buildings make up the total structure, building “A” has multiple courts and a turf area for batting practice, hitting golf balls, or running. Building “B” is a link building that houses the weight room on the first floor and wrestling on the mezzanine above.