- Client: Zoetis Pharmaceutical
- Date Completed: 11/30/2015
- Location: Lincoln, Nebraska
- Architect: CRB Builders
- Download PDF
Zoetis – Synovex Expansion
Ironhide Construction was a subcontractor on the project to expand the Zoetis manufacturing site. Ironhide installed insulated metal wall panels and a roof on a 60′ tall structural steel building intended for pharmaceutical-grade air infiltration requirements. We installed removable portions of the wall for future installation of equipment and machinery.
Ironhide completed other small scopes of work with the general contractor, as well as helped to qualify and select subcontractors for many other aspects of the project.